Mostly Rehabed Property was being rehabbed and needs to be finished. 86 SIDE: Finish the rehab OF Double Block 86 side needs heating system. New Drywall, rugs, tile, ceiling fans, kitchen, 200 Amp Elec. Service, bathrooms washer/dryer hookup on 1st fl. 88 SIDE: needs Kitchen and Baths new drywall, doors, elec., plumbing, ready to be finished. Roof is new. Both sides have large walk up attics.
